Your Projects
Click a project to open it. Use + New Project to start tracking a new build.
Project Setup
Project Information
Baseline Schedule
Excel (.xlsx) recommended. PDFs can be extracted as text but may need manual cleanup.Supported: .xlsx, .xls, .csv, .pdf · An import wizard opens after upload
What columns does the wizard look for?
- Required: Activity / Task name · Discipline (or Trade / Craft / System) · Start (BL Start / Baseline Start / Planned Start) · Finish (BL Finish / Baseline Finish / Planned Finish)
- Optional: Area / Zone / Building · Floor / Level / Story · Subcontractor (Sub / Vendor / Responsible / Resource) · Weight (man-hours / cost / budget / duration)
Schedule History
When a revised baseline is issued, upload it here. The current schedule and every week of progress saved against it gets archived. The dashboard automatically uses whichever schedule was in effect for each week, so the S-curve and KPIs stay accurate over the project's life.
Schedule Analysis
Pick two schedules to see what activities were removed, added, or changed between them.Subcontractors by Discipline
One subcontractor per discipline. These names will appear in the leaderboard.
| Discipline | Subcontractor |
|---|
Activities Loaded
Auto-generated from the schedule. Edit weights to control how each activity contributes to overall % complete (defaults to equal weight).
| Act ID | Activity | Discipline | Area | Floor | Dur | Start | Finish | Weight |
|---|
Edit Schedule
Pick a schedule (Baseline, any CR revision, or the current), then edit any activity's start / finish / duration. Changing one of the three date fields auto-recalculates the other. The S-curve below refreshes with every edit.| Act ID | Activity | Discipline | Area | Floor | Duration | Start | Finish |
|---|
Weekly Update
Filters — pick which disciplines / areas / floors to include. Applies to this weekly entry and the dashboard.
Weekly Progress Entry
Enter actual % complete (0–100) for each activity that has progress this week. Leave blank to copy last week's value, or upload an Excel file with the % column filled in.
| Act ID | Activity | Discipline | Area | Floor | Start | End | Dur | Remaining | Planned % | Last Actual | This Week % | Status | Actions |
|---|
Weekly Update History
All weeks you've saved. Click View entries on any row to see every activity and % you reported that week.
| Week Ending | Saved On | Activities Updated | Avg Reported % | Project Overall % |
|---|
4-Week Look-Ahead
Planned schedule on the left. Subcontractor submissions on the right.SUBCONTRACTOR SUBMISSIONS
Project Dashboard
Filters
S-Curve — Planned vs Actual
Schedule Updates
Each revision's full-project planned curve. Always shows the entire scope — not affected by the filter chips above.Single Schedule View
Pick one revision to see just its planned curve, without the other lines competing for attention.Subcontractor Leaderboard (SPI)
SPI = actual / planned. Above 1.0 is ahead, below 1.0 is behind.
| Sub | Discipline | Planned | Actual | SPI |
|---|
Discipline Mix
Share of remaining scope by discipline.